(02) 8502 0326 | email

Theatre 1 Structural Re-Fit

Theatre 1 Structural Re-Fit

Cyantific Technical Services were engaged to provide the building services for the structural re-fit of theatre 1 and Brisbane’s Holy Spirit Northside. This projectinvolved designing the gas,lighting and electrical systems as well as fabricating the structural mounting brackets for the new medical pendants.

Specs

  • Project Management.
  • Gas, Electrical and lighting system design and installation.
  • Structural mounting bracket design and fabrication.


Fatal error: Uncaught Error: Call to undefined function mysql_query() in /home/customer/www/cyantifictech.com.au/public_html/wp-content/themes/u-design/single-Portfolio.php:48 Stack trace: #0 /home/customer/www/cyantifictech.com.au/public_html/wp-content/themes/u-design/single.php(14): include() #1 /home/customer/www/cyantifictech.com.au/public_html/wp-includes/template-loader.php(106): include('/home/customer/...') #2 /home/customer/www/cyantifictech.com.au/public_html/wp-blog-header.php(19): require_once('/home/customer/...') #3 /home/customer/www/cyantifictech.com.au/public_html/index.php(17): require('/home/customer/...') #4 {main} thrown in /home/customer/www/cyantifictech.com.au/public_html/wp-content/themes/u-design/single-Portfolio.php on line 48